Tungkillo Compute and Energy Hub

Page last updated: 5 November 2026

What we are hearing

We have received a high level of interest in the proposal, with a large number of enquiries, questions and feedback from the community.


We recognise that some members of the community have concerns about the process to date and want reassurance about the planning and assessment processes being followed. We are also hearing a range of views about the proposal itself. These include strong opposition from some community members, concerns about whether Tungkillo is an appropriate location for the proposed development, and questions and concerns about water use and supply, electricity and energy infrastructure including the proposed on-site gas generation, impacts on farming land, the River Murray International Dark Sky Reserve and night-time lighting, noise, traffic, bushfire risk, local ecology, and whether the region would see a genuine benefit from the project.


We want to acknowledge these concerns rather than simply tell you more about the proposal.

About the proposal

Quantum DC is proposing to develop the Tungkillo Compute and Energy Hub at 312 Collins Road, Tungkillo, approximately 55 kilometres east of Adelaide.


The proposal would combine a hyperscale data centre with dedicated energy infrastructure to support the growing demand for digital services, cloud computing and artificial intelligence across Australia. No development application has been lodged and nothing has been approved.


The proposed development includes:

  • A hyperscale data centre with a capacity of approximately 1,200 MW
  • On-site gas-fired generation (gas turbines), which runs to firm the hub's own power supply when wind and solar output is low, not continuously
  • Two new substations and electrical infrastructure connecting to the existing ElectraNet 275 kV transmission line that crosses the site
  • Supporting infrastructure, including access roads, water management systems and services

The project would be delivered in three stages, with Stage 1 anticipated to commence operations in 2028 and the full development completed by 2031.


The site is co-located with battery energy storage projects that are being developed separately. Those projects are subject to their own approvals and do not form part of this application.

Why Tungkillo?

  • Many people have asked why this site. ElectraNet's existing 275 kV transmission lines cross the site, which allows the project to connect to the electricity network on site without building new long-distance transmission lines.
  • The Murray Bridge, Tungkillo and Tailem Bend corridor is a strategically significant position on South Australia's transmission network, and an existing high-pressure gas pipeline and fibre are within reach.
  • Quantum DC assessed sites across South Australia's 275 kV transmission network against the same criteria, which are set out in the frequently asked questions document below.
  • The land is used for grazing. It has a limited natural water supply and is not suited to more intensive farming such as growing crops.
  • Approximately 120 hectares of the 220-hectare site, across five parcels, would be developed for project infrastructure. The remaining approximately 100 hectares would remain undeveloped and continue to be used for grazing.

What the project would bring

If it is approved, the Tungkillo Compute and Energy Hub is intended to:

  • Create jobs during construction and ongoing jobs once operating
  • Contribute to the local community through council rates
  • Provide opportunities for local suppliers and contractors
  • Attract investment into regional South Australia
  • Add new renewable energy supply to South Australia's electricity system
  • Support growing demand for cloud computing, artificial intelligence and data storage

Energy and water

The hub would be connected to the electricity network through a new connection to the existing ElectraNet 275 kV transmission lines that cross the site. Quantum DC would contract new wind and solar generation from elsewhere in South Australia to supply the hub, and would build gas-fired generation (gas turbines) on the site, which runs to firm that supply when wind and solar output is low, not continuously. The project is designed so that wind and solar supply around 80% of the electricity the data centre uses, with the on-site gas-fired generation supplying around 20%.


The hub is designed to bring its own supply to the market. It would have its own on-site generation and would contract new renewable energy supply, so that it adds to South Australia's electricity supply rather than drawing on the supply that homes and businesses rely on. Quantum DC has commissioned independent modelling of the effect on electricity prices to test this. At times the hub's on-site generation would also supply electricity into the grid.

The data centre is not designed to rely on diesel generators for back-up power. It would be backed up by its connection to the transmission network on two separate circuits, the on-site gas-fired generation and contracted battery storage elsewhere in the network. The only diesel generation currently proposed on the site is a small unit to start the gas turbines if the grid is unavailable and a small standby unit at the gas receiving facility; neither powers the data centre.


The data centre would use closed-loop, direct-to-chip liquid cooling with air-cooled heat rejection. The cooling loop is sealed and recirculates, and heat is removed by dry, air-cooled equipment rather than by evaporating water. Once the loop is filled, very little water is needed for cooling.


Rainwater harvested from the building roofs would be stored and treated on site as the main source of water for operations, supplemented where needed by water delivered by commercial water carriers. Depending on the timing of construction and water availability, harvested rainwater may also contribute to commissioning water requirements. A permanent connection to SA Water's mains is not proposed, and the project does not propose to take water directly from the River Murray or to buy water allocations from local irrigators. Construction and commissioning water supply arrangements are still being confirmed.


Current estimates indicate water demand of around 20 megalitres a year once the hub is fully operational. Construction water requirements are currently being assessed. The assessment will be submitted to SA Water for review, and the findings will be made available on the PlanSA portal with the development application. Additional water would be required for commissioning the cooling systems.

Environmental and technical studies

The proposal would go through a full assessment process before any decision is made. Specialist studies are being prepared on:

  • Traffic and road impacts
  • Noise and vibration
  • Air quality and emissions
  • Water and stormwater management
  • Native vegetation and biodiversity
  • Aboriginal cultural heritage
  • Bushfire risk and emergency management plans
  • Visual impacts and landscape character

The findings of these studies will help inform the final design and identify measures to avoid, minimise or manage impacts. These studies will form part of any development application and be made publicly available through that process.

Planning and assessment process

Quantum DC intends to apply to the Department of State Development for Crown Sponsorship of the project. If sponsorship is granted, the development application would be assessed under the Crown development and essential infrastructure provisions of South Australia's planning system.


As part of this process there is a public notification period of at least 15 business days, during which the community can consider the development application and make written submissions. The State Commission Assessment Panel (SCAP) will then review the proposal and the feedback received and provide advice to the Minister for Planning, who will make the final decision.

Community engagement

We acknowledge that this early engagement has got off to a difficult start. The first community session at Tungkillo on Thursday 29 October could not proceed because of a threat to public safety, and the Mannum session that was to follow it was postponed. We know there is frustration and disappointment about how things have unfolded.


That difficult start does not change our commitment to giving people the opportunity to hear more, ask questions and share their views before any development application is lodged. Direct engagement is already under way. We have written to neighbouring landowners offering to meet with them, we are making direct contact with local community groups and organisations, and we have started replying to people who have written to us.


This early engagement is separate from, and in addition to, the formal planning process. Feedback received will be documented and included in an Engagement Report submitted with any development application and made publicly available as part of the application package.


You can register below to receive project updates and to share your questions or comments with the project team.

Community information sessions

In light of recent events, we have made the decision to reschedule the community drop-in session planned for 11am–1pm Saturday 31 October, at Mannum.


We’re sorry for the inconvenience this change may cause, particularly at short notice. We have instead scheduled three community sessions to provide more opportunities for people to attend, while helping us create a safe environment where the full range of community views can be heard.


The rescheduled sessions will be held at Mannum Leisure Centre:

  • Friday 20 November, 10am–12 noon
  • Saturday 21 November, 11am–1pm
  • Saturday 21 November, 2pm–4pm


The venue can accommodate up to 200 people seated. Given the significant level of community interest, we have scheduled three sessions to provide greater opportunity for people to attend.

Need more information?

Our community fact sheet and frequently asked questions document can be downloaded below, and both will be available in print at the community information sessions.


For project enquiries, contact the project engagement team at URPS on 08 8333 7999 or engage@urps.com.au.

Project documents

Download the community fact sheet and the frequently asked questions document below.

Tungkillo Compute and Energy Hub: Community Fact Sheet (pdf)Download
Tungkillo Compute and Energy Hub: Frequently Asked Questions (FAQ) (pdf)Download

Register for project updates

Register to receive project updates and share your questions or comments with the project team.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

How we use your details

Your details will be used by Quantum DC and its community engagement consultants, URPS, to provide project updates and to record community feedback for the Engagement Report that will accompany the development application, and for no other purpose. Feedback is reported in summary form. Contact engage@urps.com.au if you would like your details removed.

Quantum DC

 Copyright © 2026 Quantum DC Pty Ltd. All rights reserved. 

Website last updated: 5 November 2026

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept